-
08220 with the marker lights refitted to all positions for the first time since possibly the mid 70's on 08thNovember2009
-
08220 with the marker lights refitted to all positions for the first time since possibly the mid 70's on 08thNovember2009
-
08220 with the marker lights refitted to all positions for the first time since possibly the mid 70's on 08thNovember2009
-
The carbon build up being removed from the engine block, where No1 cylinder head should sit on 25thOctober2009
-
The carbon build up being removed from the engine block, where No1 cylinder head should sit on 25thOctober2009
-
The carbon build up being removed from the engine block, where No1 cylinder head should sit on 25thOctober2009
-
No1 cylinder head cleaned up on 25thOctober2009
-
No1 cylinder head cleaned up on 25thOctober2009
-
No1 cylinder head showing the large amount of carbon build up on 25thOctober2009
-
No1 cylinder head showing the large amount of carbon build up on the underneath of it on 25thOctober2009
-
.thumbnail.jpg)
08220 in the shed at Ruddington with all the roof panels and bodyside doors refitted on 04thOctober2009
-
.thumbnail.jpg)
08220 in the shed at Ruddington with all the roof panels and bodyside doors refitted on 04thOctober2009
-
.thumbnail.jpg)
08220 sat outside the shed at Ruddington on 04thOctober2009
-
.thumbnail.jpg)
08220 sat outside the shed at Ruddington on 04thOctober2009
-

08220 receiving attention in the shed at Ruddington on 30thAugust2009
-

The sanders have been refitted to the loco, after we sourced some new parts on 06thSeptember2009
-

The sanders have been refitted to the loco, after we sourced some new parts on 06thSeptember2009
-

The exhaust section now refitted to the loco, which proved easier than we feared on 06thSeptember2009
-

The cab end now with wasp stripes fully applied on 30thAugust2009
-

Sections of the cab floor that had corroded away replated on 30thAugust2009
-

Sections of the cab floor that had corroded away replated on 30thAugust2009
-

08220 being shunted into the main shed at Ruddington, for the roof sections to be fitted on 09thAugust2009
-

08220 being shunted into the main shed at Ruddington, for the roof sections to be fitted on 09thAugust2009
-

08220 receiving attention to the axle box's in the main shed at Ruddington on 09thAugust2009
-

08220 receiving attention to the axle box's in the main shed at Ruddington on 09thAugust2009
-

08220 receiving attention to the axle box's in the main shed at Ruddington on 09thAugust2009
-

08220 receiving attention to the axle box's in the main shed at Ruddington on 09thAugust2009
-

The new door stops being fitted to the door frame on 08220 ready for the cab doors on 28thJune2009
-

The new door stops awaiting to be fitted to 08220 07thJune2009
-

The filters refitted to the generator room doors on 31stMay2009
-

The last of the drive belts now refitted to the aux generator on 31stMay2009
-

The Cabside with the new vinyls applied viewed through the shed window on 31stMay2009
-

The Radiator louvers refitted to the loco & with the marker lights in place has transformed the look of the loco on 31stMay2009
-

The side grills for the radiator cleaned and painted up on 31stMay2009
-

The restored Marker lights have started to be refitted to the loco on 31stMay2009
-

The Belts now refitted to the Traction Motor blower on 08220 on 31stMay2009
-

08220 now with all the cabside vinyls applied on 10thMay2009
-

08220 with all the bodyside doors refitted on 10thMay2009
-

The battery box cover refitted to the loco now the batteries have been fitted and charged on 26thApril2009
-

The battery box cover refitted to the loco now the batteries have been fitted and charged on 26thApril2009
-

The silencer box for 08220 receiving attention before being refitted on 26thApril2009
-

The silencer box for 08220 receiving attention before being refitted on 26thApril2009
-

The cab end having the wasp stripes applied, the look of the loco has been transformed now on 19thApril2009
-

The cab end being prepared for the wasp stripes getting applied on 19thApril2009
-

The cab restoration is progressing well & the AVR is now back in place on 11thApril2009
-

View of the loco with the radiator elements back in place and the loco in BR Blue on 11thApril2009
-

The air tanks under the loco all cleaned up & painted with the coupling guard in place on 11thApril2009
-

The air tanks under the loco all cleaned up & painted with the coupling guard in place on 11thApril2009
-

The framework now all in BR Blue with just the roof to be completed & The batteries now all in place on 11thApril2009
-

08220 looking magnificent in BR Blue at Ruddington on 11thApril2009
-

The cabside now fully painted in BR Blue just awaiting the attachment of numbers and data panel on 11thApril2009
-

The pipes all back in place and attached to the radiator on 11thApril2009
-

The radiator elements now attached to the loco after being pressure tested on 11thApril2009
-

The radiator now with the wasp stripes applied on 05thApril2009
-

The radiator now with the wasp stripes applied on 05thApril2009
-

The radiator now with the wasp stripes applied on 05thApril2009
-

Showing the generator room doors refitted to the loco and the bodywork restoration progress on 28thMarch2009
-

The generator room doors painted BR Blue and refitted to the loco & the lefthand handrail straightened out on 28thMarch2009
-

08220 the Rods on both sides of the loco are now painted yellow and bodywork restoration continues on 21stMarch2009
-

The new radiator for 08220 now painted yellow and ready for the wasp stripes to be applied at Ruddington on 21stMarch2009
-

The new radiator for 08220 now painted yellow and ready for the wasp stripes to be applied at Ruddington on 21stMarch2009
-

08220 has now had a few coats of yellow paint and ready for the wasp stripes to be applied at Ruddington on 21stMarch2009
-

08220 Framework being painted after being taken back to bare metal at Ruddington on 28thFebruary2009
-

08220 Battery box being overhauled on 28thFebruary2009
-

08220 Generator room receiving attention at Ruddington on 28thFebruary2009
-

08220 Generator room receiving attention at Ruddington on 28thFebruary2009
-

The new Generator room doors receiving a coat of blue undercoat at Ruddington on 28thFebruary2009
-

08220 Battery box being overhauled on 28thFebruary2009
-

08220 IN THE CENTRE OF THE RADIATOR THE SMALL HOLE HAS NOW BEEN WELDED UP READY FOR TESTING AT RUDDINGTON, GCRN ON 07MARCH2009
-

08220 RADIATOR BEING PAINTED IN UNDERCOAT READY FOR THE WASP STRIPES TO BE ADDED AT RUDDINGTRON, GCRN ON 07MARCH2009
-

08220 FRAMEWORK BEING PAINTED IN BLUE UNDERCOAT AT RUDDINGTON, GCRN ON 07MARCH2009
-

08220 RADIATOR BEING PAINTED IN UNDERCOAT READY FOR THE WASP STRIPES TO BE ADDED AT RUDDINGTRON, GCRN ON 07MARCH2009
-

08220 GENERATOR DOORS NOW IN BRITISH RAIL BLUE AT RUDDINGTON, GCRN ON 07MARCH2009
-

08220 HAVING MORE BRITISH RAIL BLUE ADDED TO THE CAB FRAMEWORK AT RUDDINGTON, GCRN ON 07MARCH2009
-

08220 HAVING MORE BRITISH RAIL BLUE ADDED TO THE CAB FRAMEWORK AT RUDDINGTON, GCRN ON 07MARCH2009
-

08220 exhauster box cover and a rocker cover from the engine receiving attention on 01february2009
-

08220 bodyside door now in a coat of British Rail Blue on 01february2009
