Structures And Signalling Gallery

View of the lever frame inside Ruddington Signalbox, the box was rescued from Neasden and is an original GCR box 14.06.08
View of the lever frame inside Ruddington Signalbox, the box was rescued from Neasden and is an original GCR box 14.06.08

View of the lever frame inside Ruddington Signalbox, the box was rescued from Neasden and is an original GCR box 14.06.08
 
View of the lever frame inside Ruddington Signalbox, the box was rescued from Neasden and is an original GCR box 14.06.08
View of the lever frame inside Ruddington Signalbox, the box was rescued from Neasden and is an original GCR box 14.06.08

View of the lever frame inside Ruddington Signalbox, the box was rescued from Neasden and is an original GCR box 14.06.08
 
View of Ruddington Signalbox with the newly built lamp room, the box was rescued from Neasden and is an original GCR box 28.02.09
View of Ruddington Signalbox with the newly built lamp room, the box was rescued from Neasden and is an original GCR box 28.02.09

View of Ruddington Signalbox with the newly built lamp room, the box was rescued from Neasden and is an original GCR box 28.02.09
 
The newly built platform 1 at Ruddington Fields, the track was receiving final work before we could start running trains into here 28.02.09
The newly built platform 1 at Ruddington Fields, the track was receiving final work before we could start running trains into here 28.02.09

The newly built platform 1 at Ruddington Fields, the track was receiving final work before we could start running trains into here 28.02.09
 
Platform 1 at Ruddington Fields with the track work completed and awaiting trains to start arriving 26.07.09
Platform 1 at Ruddington Fields with the track work completed and awaiting trains to start arriving 26.07.09

Platform 1 at Ruddington Fields with the track work completed and awaiting trains to start arriving 26.07.09
 
View of Ruddington Signalbox with the newly built lamp room, the box was rescued from Neasden and is an original GCR box 26.07.09
View of Ruddington Signalbox with the newly built lamp room, the box was rescued from Neasden and is an original GCR box 26.07.09

View of Ruddington Signalbox with the newly built lamp room, the box was rescued from Neasden and is an original GCR box 26.07.09
 
Platform 1 at Ruddington Fields with the track work completed and awaiting trains to start arriving 26.07.09
Platform 1 at Ruddington Fields with the track work completed and awaiting trains to start arriving 26.07.09

Platform 1 at Ruddington Fields with the track work completed and awaiting trains to start arriving 26.07.09
 
Platform 1 at Ruddington Fields viewed from the car park showing the full length of the platform 26.07.09
Platform 1 at Ruddington Fields viewed from the car park showing the full length of the platform 26.07.09

Platform 1 at Ruddington Fields viewed from the car park showing the full length of the platform 26.07.09
 
The cafe at Ruddington which serves a selection of food and drink, whilst waiting to board the next train it is the ideal place to wait 09.08.09
The cafe at Ruddington which serves a selection of food and drink, whilst waiting to board the next train it is the ideal place to wait 09.08.09

The cafe at Ruddington which serves a selection of food and drink, whilst waiting to board the next train it is the ideal place to wait 09.08.09
 
The signal gantry that protects Ruddington Fields station and yard awaiting for to be brought back into use as and when the site develops more 07.03.10
The signal gantry that protects Ruddington Fields station and yard awaiting for to be brought back into use as and when the site develops more 07.03.10

The signal gantry that protects Ruddington Fields station and yard awaiting for to be brought back into use as and when the site develops more 07.03.10
 
View of one of the many bridges along the route of the GCRN, this is the A60 bridge outside BRUSH works Loughborough
View of one of the many bridges along the route of the GCRN, this is the A60 bridge outside BRUSH works Loughborough

View of one of the many bridges along the route of the GCRN, this is the A60 bridge outside BRUSH works Loughborough
 
The Pway Gang working on the building of Platform 2 at Ruddington Fields 16.03.11
The Pway Gang working on the building of Platform 2 at Ruddington Fields 16.03.11

The Pway Gang working on the building of Platform 2 at Ruddington Fields 16.03.11
 
Asher Lane Signalbox and Crossing Keepers cabin 19.04.11
Asher Lane Signalbox and Crossing Keepers cabin 19.04.11

Asher Lane Signalbox and Crossing Keepers cabin 19.04.11
 
The track layout at Rushcliffe Halt North end before the pointwork is removed to make the layout easier for twin track running through the station 31.05.11
The track layout at Rushcliffe Halt North end before the pointwork is removed to make the layout easier for twin track running through the station 31.05.11

The track layout at Rushcliffe Halt North end before the pointwork is removed to make the layout easier for twin track running through the station 31.05.11
 
Rushcliffe Halt North end with the pointwork now removed and plain tracked through both platforms 07.06.11
Rushcliffe Halt North end with the pointwork now removed and plain tracked through both platforms 07.06.11

Rushcliffe Halt North end with the pointwork now removed and plain tracked through both platforms 07.06.11
 
Rushcliffe Halt South end being remodelled with pointwork and groundframe being put in place 10.06.11
Rushcliffe Halt South end being remodelled with pointwork and groundframe being put in place 10.06.11

Rushcliffe Halt South end being remodelled with pointwork and groundframe being put in place 10.06.11
 
Rushcliffe Halt with the new layout completed, allowing trains to be in both platforms 29.06.11
Rushcliffe Halt with the new layout completed, allowing trains to be in both platforms 29.06.11

Rushcliffe Halt with the new layout completed, allowing trains to be in both platforms 29.06.11
 
Rushcliffe Halt South end remodelled with pointwork and groundframe now added to allow access to both platforms 05.07.11
Rushcliffe Halt South end remodelled with pointwork and groundframe now added to allow access to both platforms 05.07.11

Rushcliffe Halt South end remodelled with pointwork and groundframe now added to allow access to both platforms 05.07.11